metal roof installation for Dundee homes, handled by a family roofing company that has been at it since 2002. Estimates are always free.
A metal roof is what Roofing Brothers is known for, and it has been since 2002. On a Dundee home that means standing seam or exposed fastener panels set over sound decking and real underlayment, with the ridge, valley and eave trim cut and fit on site rather than forced out of a box.
Our metal roof installation work in Dundee is handled by crews who do this every week, not by whoever happened to be free that morning. It shows up in the details — valleys, chimney flashing, eave and ridge closures — because that is where roofs actually leak.
We schedule your Dundee metal roof installation for a stretch of dry weather, keep the job site picked up as we go, and do not leave a roof open overnight. When it is done the tear off is hauled away and a magnet goes over the drive.
Four steps and no surprises. This is how we have done it since 2002.
Panel type comes first — standing seam or exposed fastener — then color, then trim. We walk you through the trade offs on each one.
Rotten decking gets replaced and priced with you before it is covered up. Nobody wants to learn about that afterward.
Synthetic underlayment over the whole roof, ice and water shield in the valleys and at the eaves, then panels set square on the correct fastener spacing.
Every penetration gets a proper boot or flashing instead of a bead of sealant and a hope.
What comes up on just about every estimate for a job like this.
Most Dundee metal roof jobs land between about $12,000 and $30,000 in 2026, depending on square footage, pitch, panel type and how much tear off is involved. Standing seam runs higher than exposed fastener panels. We measure before we quote and the estimate is free.
Around twenty standard colors. Green, burgundy, bronze, black, gray, tan and barn red are the ones most Dundee homeowners land on. We bring the chart with the estimate so you can hold it against your siding.
Installed properly over sound decking, a metal roof should give a Dundee home 40 to 60 years. Standing seam often goes longer because there are no exposed fasteners to work loose or leak.
A straightforward Dundee house is usually three to five days. A cut up roof with dormers, valleys and multiple pitches takes longer, because every panel and trim piece gets measured and fit on site.
Honest words from customers, in their own wording.
"Called about shingles that blew off in a storm. They were out the next morning, patched it, and would not take a dime more than what the estimate said."
"Green metal over the whole house and the carport. Looks sharp, and it is quiet inside when it rains, which honestly surprised me."
"Ice was backing up at our eaves every winter. They cleared it, then went back and fixed the ventilation, and we have not had the problem since."